HMS Cavalier - Dry-docking 2010

In March 2010 HMS Cavalier was dry-docked for hull cleaning, inspection and repairs.  The lower hull was then re-painted using a resin based primer followed by a resin based topcoat.  The work was completed by the end of June and the ship refloated.

The following photographs show the ship being dry-docked and then various stages through the dry-docking period.